Righto, plastic membrane and second layer of carpet went in today


  • Share on Pinterest

Righto, plastic membrane and second layer of carpet went in today.

Yesterday brought the installation of the drainage/overflow/level indicator. The vertical pipe shows the level of water inside the bed, and overflows if needed. Pull the pipe down anti-clockwise to drain the water from inside if the water becomes too saline. Got 4.5 cubic metres of scoria (gravel) delivered, so today is Shovelling Day️